The Enerpac Press is now secured on the table and inside an Acrylic box
Repainting
Lifting of this 1 ton press on top of the table. Thank you Rob and Wil!
The Piston Cylinder has arrived!!! Now we gotta lift the 1 ton press (in the box) on top of that table.
Instalation of the one-atm furnace in progress. Tool organization and two heavy duty tables.
And delivery of the Wabeco D4000 Lathe.
The lab has been upgraded with more electrical power and two connections to building cooling water.
Now we've got to bring in some equipment!
This will become my lab in a few month, when I'll start my position in February 2018. Here is me taking notes and measuring the room.
Dr Sarah Lambart
Geology and Geophysics, Frederick Albert Sutton Building
115 S 1460 E, Room 409
Salt Lake City, UT 84112-0102